Schedules
Schedules
The Schedules tab lists every active schedule on the Runner — the robots set to run automatically — and when each one is next due.
Schedules are configured in the Studio
This screen only shows and monitors them. To create or edit a schedule, go to Roberty Studio: Scheduling robots.
What the screen shows
The schedules table has:
| Column | What it is |
|---|---|
| Robot | The key identifying the scheduled robot |
| Rules | A readable summary of the schedule |
| Next run | When the robot next fires automatically |
Reading the rules
Each schedule states its rules on two lines:
The period line:
Mon, Wed, Fri— the selected days of the weekDays 1, 10, 20— the selected days of the month15/01/2025, 20/01/2025 +2— specific dates (the first 3 are listed;+Nis how many more there are)
The frequency line:
Always— runs all day long, at the interval set08:00 – 17:00 (every 30m)— runs within a window of hours, at the frequency set07:00, 12:00, 19:00— runs only at the listed times
Migrating schedules from an older version
If you upgraded from an older Roberty (version 2.4.0-upgrade) to the current one, your schedules may need migrating to the new format.
When to migrate
Use this only if:
- You have Roberty
2.4.0-upgradeinstalled on the same machine - Your schedules were created in that older version and do not appear in the current list
How to migrate
- Click Start migration.
- Read the compatibility warning carefully.
- Confirm with Yes, migrate.
- Wait for it to finish.
Compatible with v2.4.0-upgrade only
The migration works only with version 2.4.0-upgrade. If you are on anything older, upgrade to 2.4.0-upgrade first, or you risk losing data.
Next
- Run queue — follow the runs in progress, live
- Scheduling robots — create and edit schedules in Roberty Studio